PREFERENCES SUMMARY
Workshop No. 5 & Open House No. 1, 2 & 3
Resident Location       Preferred Alternative     Traffic Signal at SE 34th Street
Total Maintenance Existing Improved Multi-Use Separated Trail Bike Lane Modified Multi-use Yes No
Parkway 192 40 64 30 32 26 114 65
Adjacent 75 10 12 15 32 6 41 30
Bellevue 39 0 0 5 31 3 25 9
Other 50 0 7 5 37 1 17 19
                 
TOTAL 356 50 83 55 132 36 197 123
14% 23% 15% 37% 10%
HOME
HOME